The main changes to the infrastructure network around Vicenza involve:
May 2021
February 2022
Verona - Padua, Veneto
Colas Rail Italia S.p.A.
New electrification featuring a catenary system with 540 mm² CSA wire and 270 mm² CSA wire with 3 kV D.C. for the sections and stations with connections for phases on existing and new layout realignments.
Final Design for the Verona - Padua HS/HC Line
Verona - Vicenza Subsection
Route section II: crossing through Vicenza
69.200 km of single running plain track
48.800 km of single station plain track
1036 LSU-type ET masts required by the project
10,841 m³ of concrete for the ET foundations
55.900 km of 100 mm² CSA copper-silver contact wire
86.100 km of 150 mm² CSA copper-silver contact wire
142.800 km of 120 mm² CSA copper messenger cable
11 activation phases for the complex provisional construction phases interacting with the existing layout and the development of complex disruptive civil works on the layout to keep the line up and running.
€23,900,082.92
69.200 km
The total distance in kilometres of the “running” and “station” plain track undergoing new electrification.
10,841 m³
m³ in total of concrete used for the new surface and deep foundations of the ET masts.
86.100 km
In total of contact wire installed for the new electrification.