Verona - Padua HS/HC Line Verona - Vicenza Subsection Route Section II: crossing through Vicenza

Railway line

Type of work

Final design for the Verona - Padua HS/HC Line
Verona - Vicenza Subsection
Route section II: crossing through Vicenza

Country/Location

Verona - Padua, Veneto

Year

May 2021 - February 2022

Project technical details

Project description

The main changes to the infrastructure network around Vicenza involve:

  1. Quadrupling the track running alongside from the start of the work up until the entrance into Vicenza;
  2. The construction of a new stop on the line at Fiera called “Fermata Fiera“;
  3. The construction of working connections between the two lines near the entrance to the station which allow the potential routing over both lines if they need repairs and/or are out of service;
  4. Putting Vicenza Viale Roma station on the town master plan (PRG) with the construction of the 3 smaller basic stations described below:
    • Basic service station for the historical line formed of 5 tracks, including 2 plain tracks and 3 passing tracks;
    • Basic HS/HC service station for the historical line formed of 4 tracks, including 2 plain tracks;
    • Basic freight service station mainly for connections around Vicenza and for Trenitalia train maintenance depots (OGR) formed of 6 tracks with 1 through track.
  5. The organisation of the track switch branch on the Verona side;
  6. The partial organisation of the track switch branch on the Padua side;
  7. The construction of a new set of 4 tracks for holding stock, connected to the central service area for maintenance vehicles and rolling stock on the Schio line;
  8. The construction of a track for holding permanent way maintenance vehicles, with an annexed storage yard.

Technical information

Work start date

May 2021

Work end date

February 2022

Location/Country

Verona - Padua, Veneto

Client

Colas Rail Italia S.p.A.

Brief description

New electrification featuring a catenary system with 540 mm² CSA wire and 270 mm² CSA wire with 3 kV D.C. for the sections and stations with connections for phases on existing and new layout realignments.

Type of Project

Final Design for the Verona - Padua HS/HC Line
Verona - Vicenza Subsection
Route section II: crossing through Vicenza

km/catenary mm²

69.200 km of single running plain track
48.800 km of single station plain track

Project technical details

1036 LSU-type ET masts required by the project
10,841 m³ of concrete for the ET foundations
55.900 km of 100 mm² CSA copper-silver contact wire
86.100 km of 150 mm² CSA copper-silver contact wire
142.800 km of 120 mm² CSA copper messenger cable

Critical issues

11 activation phases for the complex provisional construction phases interacting with the existing layout and the development of complex disruptive civil works on the layout to keep the line up and running.

Final cost

€23,900,082.92

69.200 km

km of single running plain track

The total distance in kilometres of the “running” and “station” plain track undergoing new electrification.

10,841 m³

Concrete for ET foundations

m³ in total of concrete used for the new surface and deep foundations of the ET masts.

86.100 km

150 mm² CSA copper-silver contact wire

In total of contact wire installed for the new electrification.