Upgrades to the historical Bussoleno - Avigliana line

Railway line

Type of work

Modane - Turin line
Upgrades to the historical Bussoleno - Avigliana line

Country/Location

Bussoleno - Avigliana, Piedmont

Year

May 2019 - February 2020

Project technical details

Project description

The historical line between Bussoleno - Avigliana runs on a 3 kV D.C. and is electrified with a 610 mm² catenary system (adjustable wires and cables) on horizontal steel cantilevers and with a rail head height of 5.20 metres as well as a primary power supply circuit of 66kV alongside the odd-numbered track of the section in question. The project involves the decommissioning and demolition of the primary 66kV line in operation between the towns of Bussoleno and Collegno and the construction of the new overhead line between the portals outside Bussoleno and Avigliana stations with an equivalent section of 540 mm² adjustable messenger cable and the addition of a 230 mm² back-up feeder, required for the correct running of the line according to the expected operating traffic.
The decommissioning of the 66kV line will happen after the new Borgone and Avigliana traction substations go into service.

Technical information

Work start date

May 2019

Work end date

February 2020

Location/Country

Bussoleno - Avigliana, Piedmont

Client

NET ENGINEERING S.p.A.

Brief description

New electrification featuring a catenary system with 540 mm² CSA wire and 270 mm² CSA wire with 3 kV D.C. for the sections and stations with phase connections, including the addition of a 230 mm² back-up feeder, and the decommissioning of the primary 66kV line.

Type of Project

Final design for the Modane - Turin line
Upgrades to the historical Bussoleno - Avigliana line

km/catenary mm²

47.800 km of single running plain track
22.200 km of single station plain track

Project technical details

556 LSU-type ET masts required by the project
6,411 m³ of concrete for the ET foundations
42.026 km of 230 mm² CSA copper cable
95.650 km of 150 mm² CSA copper-silver contact wire
95.650 km of 120 mm² CSA copper messenger cable

Critical issues

Activation phases to keep the railway up and running and the use of non-standard supports compared with the ET technical specifications for use of the back-up feeder.

Final cost

€20,000,000

47.800 km

km of single running plain track

The total distance in kilometres of the “running” and “station” plain track undergoing new electrification.

6,411 m³

Concrete for ET foundations

m³ in total of concrete used for the new surface and deep foundations of the ET masts.

95.650 km

150 mm² CSA copper-silver contact wire

In total of contact wire installed for the new electrification.

Client
NET Engineering S.r.l.

NET Engineering S.r.l.

Country
Italy

Italy

Want to know more?