The section in question is about 15.7 km long and mainly runs in the open air (there is only one tunnel about 3 km long). It is formed of short sections with trenches, embankments and ordinary small and medium-sized prestressed concrete viaducts with a mixed steel-concrete structure.
The new section realignment is formed of the following places and main services that form part of its Electric Traction systems:
July 2020
Ongoing
Naples - Cancello, Campania
Systra - Sotecni S.p.A.
New electrification featuring a catenary system with 540 mm² CSA wire and 270 mm² CSA wire with 3 kV D.C. for the sections and stations
Working drawings and detailed design of 3 kV D.C. electric traction systems
37.100 km of single running plain track
8.540 km of single station plain track
1,103 LSU-type ET masts required by the project
5,500 m³ of concrete for the ET foundations
82.72 km of 150 mm² CSA copper-silver contact wire
82.72 km of 120 mm² CSA copper messenger cable
Activation phases on existing connections, a stop in a tunnel with an electric traction safety system
€9,104,782.24
37.100 km
The total distance in kilometres of the “running” and “station” plain track undergoing new electrification.
5,500 m³
m³ in total of concrete used for the new surface and deep foundations of the ET masts.
82.72 km
In total of contact wire installed for the new electrification.