The E.T. work in this project for the medium and long-term work essentially involves the new electrification of the realignment section tracks for the historical Brescia - Verona line and their connection with the electrification on the existing and unchanged layout, as well as the complete electrification and power supply at 3 kV DC (with remote and local control) of the quadruple-track lines for the HS connection between Brescia and Rezzato Junction.
May 2022
Ongoing
Milan - Verona, Lombardy - Veneto
MERMEC STE S.p.a.
Final design for the quadrupling of the line leaving Brescia station to complete the independent running of the Turin - Venice H.S./H.C. line for the section between Brescia Station and Verona.
H.S./H.C. line final design Turin - Venice
33.200 km of single running plain track
46.000 km of single station plain track
No. - LSU-type ET masts required by the project
6,222.35 m³ of concrete for the ET foundations
96 km of 150 mm² CSA copper-silver contact wire
96 km of 120 mm² CSA copper messenger cable
36 design phases to keep the railway line up and running and 10 resolved cases of disruptions for the construction of civil works.
---
32.200 km
The total distance in kilometres of the “running” and “station” plain track undergoing new electrification.
6,222 m³
m³ in total of concrete used for the new surface and deep foundations of the ET masts.
96 km
In total of contact wire installed for the new electrification.