These working drawings involve the construction of new span segments on the existing Milan - Bologna HS line for separating the “Somaglia“ and “Fontanellato“ tunnels and getting the grounding safety system up and running for the aforementioned tunnels.
January 2015
January 2016
Fontanellato, Emilia Romagna
CEIT Impianti S.r.l.
Working drawings for the construction of the grounding safety system for the tunnels on the 2x25kV A.C. Milan - Bologna HS line
Grounding safety system working drawings
12 km of single running plain track
Construction of 4 new line span segments
Construction of the “Somaglia” and “Fontanellato” tunnel grounding safety system
Studying special framework
---
12 km
The total distance in kilometres of the “running” and “station” plain track undergoing new electrification.
4