These working drawings involve the 3kV D.C. electrification of the line between Ponte S. Giovanni station and S. Anna Perugia station, including the renovation of Piscille station.
The construction of a 3 kV D.C. power line from the new traction substation of San Giovanni station is an integral part of the work.
January 2020
January 2021
Perugia, Umbria
SINTAGMA S.r.l.
Working drawings for the construction of the 3 kV D.C. electrification system on the Ponte S. Giovanni - S. Anna branch section of the Central Umbrian Railway and the Ponte San Giovanni alternative power supply.
Working drawings for the doubling of the Ponte S. Giovanni - S. Anna section in the municipality of Perugia
6.290 km of single running plain track
3.091 km of single station plain track
163 LSU-type ET masts required by the project
1,361 m³ of concrete for the ET foundations
11.700 km of 100 mm² CSA copper-silver contact wire
6.290 km of 120 mm² CSA copper messenger cable
Studying special framework and non-standard uses
€ 2,753,027.41
6,290 km
The total distance in kilometres of the “running” and “station” plain track undergoing new electrification.
1,361 m³
m³ in total of concrete used for the new surface and deep foundations of the ET masts.
11.700 km
In total of contact wire installed for the new electrification.