Working drawings and detailed design with the following documents issued:
ꞏ Electrification plans;
ꞏ Assembly diagrams;
ꞏ Disconnecting switch cable plan;
ꞏ ET protection, return and ground circuit schematics;
ꞏ Special framework;
ꞏ Special foundations;
ꞏ Tables of use for blocks and masts;
ꞏ Laser scanner survey.
January 2021
Ongoing
Isernia - Campobasso, Molise
EURO FERROVIARIA S.r.l.
New electrification featuring a catenary system with 440 mm² CSA adjustable messenger cable 3 kV D.C. and sidings featuring a catenary system with 220 mm² CSA fixed messenger cable
Working drawings and detailed design for the new electrification of the Isernia - Campobasso 3 kV D.C. section:
ꞏ Aurisina Station;
ꞏ Tunnel Junction - Aurisina Junction Section
ꞏ Aurisina Railway Link
about 60 km of single plain track
About 7,500 m³ of concrete for the ET foundations
130 km of 100 mm² CSA copper-silver contact wire
High embankments
---
60 km
The total distance in kilometres of the “running” and “station” plain track undergoing new electrification.
7,500 m³
m³ in total of concrete used for the new surface and deep foundations of the ET masts.
130 km
In total of contact wire installed for the new electrification.