These working drawings and construction design involved the electrification of a total of 110 km of railway line with an OCS 300/150 type catenary system for the tramway part of the city of Aarhus and with OCS 540/270, OCS 440/220 and OCS 610/305 for the remaining railway parts.
The design involved drafting specific technical specifications and, in particular, the calculation of base loads and structural assessments for each individual support.
January 2015
September 2019
Aarhus, Denmark
ALPIQ S.p.A.
Working drawings and construction design for the 750V D.C. electrification system of the railway line between the Odder - Aarhus - Grenaa stations, including the tramway line of the city of Aarhus and the relative locomotive depot.
Working drawings and construction design
110 km of single running/station plain track
16 km of single tramway plain track
3,600 ET masts required by the project
- m³ of concrete for the ET foundations
265 km of 100/150 mm² CSA copper-silver contact wire
240 km of 120/155/150 mm² CSA copper messenger cable
Studying specific technical specifications, studying and developing all the framework, determining the base loads for each individual support. Developing the design of 49 stations/stops.
---
116 km
The total distance in kilometres of the “running” and “station” plain track undergoing new electrification.
3,600 m³
Supports required by the line electrification.
256 km
In total of contact wire installed for the new electrification.