The structural assessment technical report for the “cat’s head pylon” in question was done using finite element modelling and analysis of the electric anchors for the surrounding tensioned structures.
March 2020
April 2020
Lombardy - Milan - Venice HS
CEPAV DUE Consortium
Structural assessment technical report for the high-voltage power anchoring “cat’s head pylon” on the Milan-Venice HS line
High-Voltage Load Technical Report
--- km of single running plain track
--- km of single station plain track
4.650 daN weight of the structure
70 m anchoring span length
1.750 daN maximum operating size
272.000 daN maximum working moment at the base
---
---
4.650daN
70 m
1.750daN
Get in touch with our professionals