Structural assessment technical report for the high-voltage power anchoring “cat’s head pylon”

High-speed railway line

Type of work

High-Voltage Load Technical Report

Country/Location

Lombardy - Milan - Venice HS

Year

March 2020 - April 2020

Project technical details

Project description

The structural assessment technical report for the “cat’s head pylon” in question was done using finite element modelling and analysis of the electric anchors for the surrounding tensioned structures.

Technical information

Work start date

March 2020

Work end date

April 2020

Location/Country

Lombardy - Milan - Venice HS

Client

CEPAV DUE Consortium

Brief description

Structural assessment technical report for the high-voltage power anchoring “cat’s head pylon” on the Milan-Venice HS line

Type of Project

High-Voltage Load Technical Report

km/catenary mm²

--- km of single running plain track
--- km of single station plain track

Project technical details

4.650 daN weight of the structure
70 m anchoring span length
1.750 daN maximum operating size
272.000 daN maximum working moment at the base

Critical issues

---

Final cost

---

4.650daN

Weight of the structure

70 m

Anchoring span length

1.750daN

Maximum operating size
Client
Consorzio CEPAV DUE

Consorzio CEPAV DUE

Country
Italy

Italy

Want to know more?

Get in touch with our professionals