Working drawings, detailed design and providing tables of use for foundation blocks on the surface and with micropiles. Laser scanner survey of the stations and various interferences.
February 2018
October 2020
Apulia - Italy
Sirti S.p.A.
3 kV D.C. electric traction systems
New electrification featuring a catenary system with 440 mm² CSA adjustable messenger cable 3 kV D.C. for the following sections:
Section 2 Lecce - Zollino
Section 3 Zollino - Gagliano del Capo
Section 4 Maglie - Otranto
83.700 km of single running plain track
13.100 km of single station plain track
1,800 LSU-type ET masts required by the project
16,500 m³ of concrete for the ET foundations
195 km of 100 mm² CSA copper-silver contact wire
210 km of 125 mm² CSA copper messenger cable
High trenches made from rock and high embankments
-
83,700km
The total distance in kilometres of the ‘running’ and ‘station’ plain track undergoing new electrification.
16,500m³
m³ in total of concrete used for the new surface and deep foundations of the ET masts.
195km
In total of contact wire installed for the new electrification.