Realization du Tronçon 1 Oued Tlelat -Tlemcen (130 km) de la nouvelle ligne a double voie

High-speed railway line

Type of work

Working drawings and construction design of the 1x25 kV A.C. line “Oued Tlelat - Tlemcen” with a French “85” catenary system

Country/Location

Tlelat - Tlemcen, Algeria

Year

January 2013 - December 2016

Project technical details

Project description

E.T. system design, structural assessments of supports and foundations, typological drawings, material requirements planning for the entire 130 km of double-track line.

Technical information

Work start date

January 2013

Work end date

December 2016

Location/Country

Tlelat - Tlemcen, Algeria

Client

S.I.F.EL. S.p.A.

Brief description

E.T. system design, structural assessments of supports and foundations, typological drawings, material requirements planning for the entire 130 km of double-track line.

Type of Project

Working drawings and construction design of the 1x25 kV A.C. line

km/catenary mm²

260 km of single running plain track
30 km of single station plain track

Project technical details

5,175 HEA-HEB-type ET masts required by the project
8,000 m³ of concrete for the ET foundations
318.795 km of 107 mm² CSA copper contact wire
320.323 km of 65 mm² CSA bronze messenger cable

Critical issues

Drafting the new technical specifications for ANESRIF and studying special framework and non-standard uses.

Final cost

---

260 km

km of single running plain track

The total distance in kilometres of the “running” and “station” plain track undergoing new electrification.

8,000 m³

Concrete for ET foundations

m³ in total of concrete used for the new surface and deep foundations of the ET masts.

318.795 km

107 mm² CSA copper-silver contact wire

In total of contact wire installed for the new electrification.

Client
S.I.F.EL. S.p.A.

S.I.F.EL. S.p.A.

Country
Algeria

Algeria